A Draft Office Cleaning RFP for a Commercial Building, Section by Section

Key Takeaways
- An RFP has one job: to make the bids comparable. Every section below exists to remove one variable that would otherwise make two proposals impossible to put side by side.
- Keep the RFP body short and push the detail into exhibits — a scope grid, an insurance schedule, a pricing sheet and a scoring table. Bidders fill in exhibits; they skim prose.
- The scope exhibit should be a grid of areas against frequencies, not a paragraph of tasks. A bidder who has to interpret your scope will price their interpretation of it, not yours.
- The pricing sheet has to ask for the cleaner-hours per visit beside the number. Two monthly figures with no hours behind them are two unknown quantities that happen to share a unit.
- Publish the scoring weights inside the RFP. Bidders write a different proposal when they can see that quality assurance and staffing carry weight and price is not the whole decision.
- Allow four to six weeks from issue to award, and two to four weeks more for insurance, vendor registration and badging before the first shift. Awarding on a Friday for a Monday start is how a transition goes wrong.
Ask an AI assistant for a draft office cleaning RFP and you get a list of headings. Background, scope of work, standards, pricing, evaluation, points of contact. Every heading is right, and the document is still unusable — because the thing that decides whether your bids are comparable is never the heading. It is the three or four sentences underneath it.
This is the long version of our short answer on writing a cleaning RFP. That page lists the sections and says which ones New York buildings need. This one is the draft: what to write in each section, the four exhibits that carry the real detail, and the specific sentences that stop a bidder quietly pricing something other than what you asked for. Copy it, delete what does not apply to your building, and fill in the brackets.
It carries no figures, ours or anyone's, because this site publishes none. In an RFP that happens to be the right posture anyway: you are not telling bidders what to charge, you are telling them what to state.
What Is an RFP Actually For?
Not to describe your building. Not to be fair, although it helps. An RFP exists to remove variables, so that when four proposals land on your desk the differences between them are real differences and not differences of interpretation.
That is a useful test to apply to every sentence you are about to write. Does this line remove a variable? “Vendor shall maintain a high standard of cleanliness” removes nothing; four bidders will read it four ways and price it four ways. “Vendor shall state the number of cleaner-hours per visit on which its price is based” removes the single largest one. Most of the length in a bad RFP is sentences of the first kind.
The variables worth removing, roughly in the order they cost you money: how much labour is behind the price, what counts as in scope, who supplies and stocks consumables, who absorbs building charges such as freight and overtime access, what happens when the work is not done, and when the first shift actually starts.
How Should the Document Be Laid Out?
Short body, heavy exhibits. Five to eight pages of body and four exhibits beats a twenty-page narrative, for a reason that has nothing to do with elegance: the body is read once by whoever assembles the proposal, and the exhibits are filled in by the person who actually prices it. Anything you bury in prose gets skimmed. Anything you put in a grid with an empty column gets answered.
| Content | Where | Why there |
|---|---|---|
| Who you are, the property, the timetable, the rules of the process | Body | Read once, by one person |
| Task list by area and frequency | Exhibit A | It is a grid, and the bidder has to walk it line by line |
| Insurance limits, endorsements, vendor paperwork | Exhibit B | It gets forwarded to a broker, who needs it standalone |
| Pricing, labour hours, rates for extra work | Exhibit C | You need every bidder answering in identical cells |
| Scoring weights and the questionnaire behind them | Exhibit D | Publishing it changes what bidders write |
| Floor plans, square footage by area, fixture counts | Appendix | Reference, not something to fill in |
One practical note before the draft. Send the exhibits as a spreadsheet, not as a PDF. A bidder who has to retype your grid will reorganise it, and you will spend the evaluation re-aligning rows instead of comparing numbers.
What Goes in Each Section of the RFP Body?
Twelve sections. The bracketed parts are yours to fill; the rest can stand as written.
1. Invitation and Property Description
Two paragraphs. Who you are, what the space is, and the three facts a bidder needs before deciding whether to walk it at all: rentable area, occupancy, and hours.
“[Organisation] invites proposals for recurring janitorial service at [address], occupying [n] floors totalling approximately [n] rentable square feet, with approximately [n] staff on site [n] days per week. The building is [Class B / Class C], managed by [managing agent]. Service is currently performed [by an incumbent vendor / in-house] and the incumbent [is / is not] invited to bid.”
Say whether the incumbent is bidding. Bidders price a competitive process differently from a process they suspect is a formality, and the ones who suspect a formality are the ones who do not bother walking the space.
2. Submission Requirements and the Rules of the Process
Deadline with a time zone, format, file naming, where it goes, page limits, and what you will do with a late or incomplete submission. Then the two rules that protect you:
“Questions must be submitted in writing to [contact] by [date]. All questions and answers will be circulated to every bidder without attribution. Verbal guidance from any other person is not binding on [Organisation]. Proposals that omit any exhibit may be set aside without evaluation.”
The first sentence stops the best-connected bidder from getting a private briefing. The second is what you will reach for when a proposal arrives with Exhibit C blank and a cover letter explaining that pricing depends on a walkthrough.
3. Walkthrough
Make it mandatory, and say so plainly: “Attendance at a site walkthrough is a condition of bidding. Walkthroughs will be held [dates and times]; bidders must register by [date].”
A bidder who prices a commercial suite from a floor plan is guessing, and the guess will be low, and you will be the one who discovers that in month three. A mandatory walkthrough is also the cheapest due diligence you will do all process — you learn more from who shows up, who sends a salesperson alone and who brings the person who would actually run the account than from any reference call.
4. Service Objectives and Standard of Cleanliness
This is where most RFPs produce the sentence about high standards. Replace it with a named standard and an inspection method.
APPA, the higher-education facilities association, publishes five levels of appearance for custodial work that the whole industry recognises, from Level 1 (orderly spotlessness) to Level 5 (unkempt neglect). Naming a level for each area type is far more useful than any adjective: “Reception, conference rooms and client-facing areas shall be maintained at APPA Level 1 or 2. Open-plan workstations, corridors and support areas shall be maintained at APPA Level 2.” Then state how it will be measured — see section 9.
5. Scope of Work
One line in the body: “The scope of work is set out in Exhibit A. Bidders must confirm each line as included, excluded or priced separately. A proposal that does not complete Exhibit A line by line is incomplete.” The grid itself is below.
6. Supplies, Equipment and Consumables
Say who buys, who stores, who stocks and who is accountable when a dispenser is empty on a Monday morning, because these are four different decisions and most agreements settle only the first.
“State whether consumables (hand towel, tissue, soap, liners, feminine hygiene) are supplied by the vendor or by [Organisation]. If supplied by the vendor, state whether they are billed at cost, at a disclosed markup, or included in the recurring fee; disclose the markup percentage if any. [Organisation] reserves the right to audit consumable usage against delivery records. Vendor shall provide its own equipment and shall state in Exhibit C what equipment is assigned to the site full time.”
Undisclosed consumable markup is the quietest margin in the trade. Asking for it in writing costs you a sentence and tends to make the question moot.
7. Staffing, Employment Model and Screening
The section that most changes who you end up with:
“State whether personnel assigned to this site are W-2 employees of the bidder or engaged as outside labour. If any portion of the work would be performed by outside labour, identify it and state the insurance carried by that party. Describe pre-assignment training, background and reference screening, bonding, uniform and photo identification, and the supervision ratio and inspection frequency. State the crew size and the named supervisor for this site, and the notice you will give before changing either.”
Ask it as a question, not as a requirement, unless you genuinely intend to exclude every bidder who uses outside labour. Phrased as a question you learn the answer; phrased as a requirement you learn only that everyone says yes.
8. Building Access, Badging and Building Charges
Nothing here is glamorous and all of it moves the start date or the invoice.
“Vendor personnel must be registered with the managing agent and badged before the first shift. The registration process requires [documents] and typically takes [n] business days. Freight elevator is available [windows] and must be reserved [notice]; operator overtime outside those windows is charged by the building. State in Exhibit C which party you have assumed bears building freight, security and after-hours access charges.”
That last sentence prevents the most common surprise on a cleaning invoice. Both assumptions are defensible; what is not survivable is two bidders making opposite ones and you comparing their numbers as though they match.
9. Quality Assurance, Reporting and Remedies
“Describe your inspection programme: who inspects, how often, against what checklist, and how results are reported to [Organisation]. State your response time for a reported deficiency during business hours and outside them. Describe the service credit or re-performance remedy you offer for a missed visit or a failed inspection, and the inspection score below which [Organisation] may require a corrective action plan.”
Month one is easy everywhere. This section is the one you will rely on in month nine, which is when a cleaning arrangement normally goes quiet and then goes wrong.
10. Applicable Standards and Compliance
OSHA hazard communication and safety data sheets, EPA-registered disinfectants used to their labelled dwell time, local waste and recycling separation rules, and HIPAA awareness where any part of the suite handles patient information. Ask for what the bidder holds rather than demanding a credential:
“List any third-party certifications held (for example Green Seal GS-42, ISSA CIMS, GBAC STAR), the issuing body and the expiry date. If none are held, state so.”
Worth knowing how to read the answers. Those certifications are real and they do mean something, but they are facility-level or company-level programmes with a cost of entry, so plenty of capable companies in this market hold none — we do not hold any, and we say where we stand on them rather than gesture at the words. What the question is really for is catching the bidder who implies a certification in the proposal and cannot name an issuing body when asked directly.
11. Term, Transition and Exit
Avoid the temptation to lock in a long term in exchange for a better number. What you want is a short proving period and a clean exit.
“State the minimum initial term you require, the notice period for termination without cause by either party after that term, and your transition plan for the first 30 days including inventory, key and access handover, and any overlap with the outgoing vendor. State what you require from [Organisation] at exit.”
A vendor confident in its own work does not need a long commitment to protect it. For what it is worth, we move to month-to-month after 30 days, and the sector is moving that way generally; a bidder asking for a multi-year lock is telling you something about how it expects month nine to go.
12. Evaluation and Points of Contact
One line pointing at Exhibit D, one named person, one address, and an explicit statement that you may award to other than the lowest bidder and may decline to award at all.
Exhibit A — What Does the Scope Grid Look Like?
Areas down the side, frequencies across the top, one column at the end for the bidder. Build it from your own floor plate; the rows below are the spine of a typical commercial suite and the frequencies are the usual starting point, not a recommendation for your building.
| Area / task | Typical frequency | Bidder: included / excluded / priced separately |
|---|---|---|
| Reception and lobby — vacuum, glass, dust, waste, spot-clean | Each visit | |
| Workstations — waste and recycling, spot dust, horizontal surfaces to a stated height | Each visit | |
| Workstations — full high dust above that height | Monthly or quarterly | |
| Conference rooms — reset, table, glass, chairs | Each visit | |
| Restrooms — fixtures, floors, mirrors, dispenser restock, disinfection to labelled dwell time | Each visit | |
| Restrooms — machine scrub, grout, partition detail, descale | Monthly | |
| Pantry and breakroom — counters, sinks, exterior of appliances, floors, waste | Each visit | |
| Pantry — interior of refrigerator and microwave | Weekly or monthly — name the day | |
| Hard floors — dust mop and damp mop | Each visit | |
| Hard floors — burnish, strip and refinish | Quarterly / annually | |
| Carpet — vacuum traffic lanes / full vacuum | Each visit / weekly | |
| Carpet — hot water extraction | Semi-annually | |
| Interior glass and partitions | Weekly / monthly | |
| Server or comms room | Excluded unless named, escorted access only | |
| Executive offices — desk surfaces | State whether papers may be moved | |
| Waste and recycling — separation, set-out to building rules, back-of-house tidy | Each visit |
Four lines in that grid cause most of the arguments in a first year, and all four are cheap to settle on paper. Height: “dusting” with no height stated means shoulder height, and the ledge above it will go untouched for a year. Named days: “weekly” means nothing you can inspect, so write “Wednesdays”. Personal desks: say explicitly whether a cleaner may move paper and whether a desk with a note on it is to be skipped. Exclusions: the server room, the locked file room and the pantry fridge should be excluded by name, not by silence — silence is read as “included” by you and “excluded” by the bidder.
If you have no scope document at all to start from, our daily and weekly task list is the same structure with the standard rows already written out, and the scope and frequency matrix can be lifted straight into Exhibit A.
Exhibit B — What Should the Insurance and Paperwork Schedule Require?
Do not write this one yourself. Copy it out of your building's tenant handbook or vendor requirements, verbatim, and send the result as a standalone page a broker can read without the rest of the RFP.
Write the limits as your handbook writes them — general liability per occurrence and in aggregate, umbrella or excess, workers' compensation and employers' liability, and auto where vehicles enter the loading dock. The numbers in your handbook are the numbers; a figure you have seen on another building's schedule is not relevant to yours, and a bidder who cannot meet the real one cannot be badged in no matter how the proposal reads.
What matters as much as the limits is the wording around them, and this is where proposals fail after award rather than during evaluation:
- Additional insured — name the building owner, the managing agent and your own entity, exactly as your handbook spells them. A certificate naming the wrong legal entity is rejected and the start date moves.
- The endorsement, not just the certificate. A Certificate of Insurance is a summary with no legal force of its own. Require the additional-insured endorsement page itself.
- Waiver of subrogation and primary and non-contributory wording, if your handbook asks for them. Many do, and many bidders' standard certificates do not carry them.
- Issued by the broker direct to the managing agent, not forwarded by the vendor, with a named certificate holder.
- Notice of cancellation and an annual renewal obligation, with a named person on your side who tracks the expiry date. Someone has to own that date or it passes.
Then the rest of the vendor file: W-9, business certificate or licence, workers' compensation certificate, a named-worker roster for badging, and the safety data sheets for every product that will be used in the space. Ask for the sheets. It is a two-minute request that tells you whether the bidder knows what is in its own bottles, and your facilities file needs them regardless. What a COI has to show, and the usual reasons one is bounced, goes into more detail than belongs in an exhibit.
Exhibit C — How Should the Pricing Sheet Be Written?
This is the exhibit that decides whether the whole exercise was worth doing, and it is the one nearly every RFP gets wrong by asking for a single number.
A recurring cleaning price is cleaner-hours multiplied by a rate. Nothing else. Two vendors can quote within a hair of each other and be selling you quantities of work that differ by a third, because one has built four cleaner-hours a night into the number and the other has built six. The monthly figure cannot tell you which. The hours can, and a vendor who is confident in its route will state them without hesitating.
So require, in cells, for each service line:
- Visits per week and per month, with the days named.
- Crew size per visit, and the hours each crew member is on site.
- Total cleaner-hours per visit and per month — the figure everything else in the evaluation hangs on.
- Supervision — hours on site per week, and whether the supervisor is included in the cleaner-hours above or additional to them. Bidders count this differently; make them declare it.
- The recurring fee, stated per month, and separately what one additional visit per week would add.
- Periodic work — each item from Exhibit A that is priced separately, per occurrence, with its frequency.
- Extra and project work — the rate per cleaner-hour for daytime, evening, weekend and emergency call-out, plus any minimum call-out duration.
- Day porter, if you want one, priced per hour and per shift separately.
- Consumables — whether included, at cost, or at a disclosed markup.
- Assumed building charges — which party the bidder has assumed pays freight, security and after-hours access.
- Escalation — the mechanism and the index, if any, for year two.
- Invoicing — cadence, payment window, and what documentation accompanies the invoice.
Add one sentence under the grid: “Proposals that do not state total cleaner-hours per visit will be scored as incomplete on staffing.” It is the only enforcement the exhibit needs, and it is the difference between an RFP that produces comparable bids and one that produces a shortlist you have to re-interview.
Then do the arithmetic across the bids yourself. Divide each recurring fee by the cleaner-hours behind it and you have one number per bidder in one unit, which is the comparison you were trying to make all along. Our own position on this is the whole of how an hourly figure should be read: the price is an output of the hours, so buy the hours.
Exhibit D — How Do You Score the Bids?
Publish the weighting inside the RFP. It is the single cheapest change you can make to the quality of what you receive, because bidders write to the scoring sheet they can see. Weight price at everything and you will get the lowest bid and the staffing that goes with it.
| Criterion | Weight | What earns the points |
|---|---|---|
| Price | 30–35% | The recurring fee and the extra-work rates, read together, not the recurring fee alone |
| Scope completeness and staffing plan | 25% | Exhibit A completed line by line; cleaner-hours per visit stated; crew size, supervision ratio and named supervisor |
| Quality assurance programme | 15% | Inspection method and cadence, reporting format, response times, remedy for a failed inspection |
| Compliance and employment model | 15% | Insurance meeting Exhibit B without exception, workers' compensation, W-2 versus outside labour, screening, badging readiness |
| References at comparable properties | 10% | Same building class, similar size, reachable contacts — and call them |
Score independently before anyone discusses, with two or three scorers, and keep the sheets. Two practical habits are worth more than the precision of the weights. First, score Exhibit A completeness before you look at any price — the proposal with blanks in it is telling you how the account will be run. Second, call the references yourself and ask one question that cannot be prepared for: what happened the last time something went wrong. The answer separates bidders faster than the rest of the sheet.
What Makes Two Bids Impossible to Compare?
Everything in this draft is aimed at the six failures below. If you take nothing else from it, take these.
| Failure | What it does to your evaluation | Fix |
|---|---|---|
| No cleaner-hours stated | You compare two unknown quantities of work | Exhibit C, with the incomplete-on-staffing sentence |
| Scope written as prose | Each bidder prices a different building | Exhibit A as a grid, confirmed line by line |
| Consumables unresolved | One bid includes them, one does not, and neither says | One question in section 6 and one cell in Exhibit C |
| Building charges unassigned | Freight and overtime access land on your invoice as a surprise | The assumed-charges cell in Exhibit C |
| No named standard | Nothing to inspect against, so nothing to enforce | APPA levels by area type, plus the inspection programme in section 9 |
| Weighting unpublished | Every bidder optimises for price because that is all it can see | Exhibit D inside the RFP |
What Does a Realistic Timeline Look Like?
Four to six weeks from issue to award, and the award is not the start date.
- Week 1 — issue the RFP; open the walkthrough calendar.
- Weeks 1–2 — walkthroughs. Insist on them.
- Week 3 — questions close; circulate every question and answer to every bidder, unattributed.
- Week 4 — proposals due.
- Week 5 — independent scoring, reference calls, clarification only where a cell is ambiguous. Do not let clarification become a second round of pricing.
- Week 6 — award, and notify the bidders who did not win. They will bid again next time if you do.
- Then two to four weeks for insurance, vendor registration and badging before the first shift, overlapping the outgoing vendor where you can.
That tail is the part people compress, and it is the part that cannot be compressed: the managing agent's registration queue does not care about your start date. If there is a gap between the old vendor leaving and the new one being badged in, plan for it deliberately rather than discovering it, which is the whole of switching without a gap.
Where This Draft Stops
Three limits worth stating plainly.
It is a commercial document, not a legal one. Prevailing wage applicability under New York labour law, union successorship and retention obligations where the building is a 32BJ house, and the enforceability of any remedy you write are all questions for your counsel and your managing agent, and the answers turn on facts about your specific building. Where a rule is complex this draft tells you to ask rather than pretending to answer; confirm with the agency, your managing agent or your counsel before relying on any of it.
It is written for a commercial office in a Class B or Class C building, which is the space we work in. A medical suite needs its own exhibit for regulated waste and patient-information areas. A restaurant, a gym and a retail floor each change Exhibit A substantially and change the hours behind it more than the task list suggests.
And it will not tell you who to pick. A well-built RFP narrows four proposals to two honest ones, which is the most a document can do; the choice between those two comes from the walkthrough, the reference calls and whether the person who would run your account was in the room. The questions worth asking at that stage are a different list from this one.
Frequently Asked Questions
What sections does an office cleaning RFP need?
How long should an office cleaning RFP be?
What should the pricing section of a cleaning RFP ask for?
Should I tell bidders how the proposals will be scored?
How many cleaning companies should I invite to bid?
Can I reuse this draft for a medical suite, a restaurant or a retail space?